![]() ![]() Commissioning Agent / Main Contractor / Sub- Contractors. Equipment Installation(Construction) Main Contractor and Sub- Contractors. ![]() Design Submissions(Design Stage) Design Team.Įlectronic Submittals(Contractor Mobilisation - Shop drawings and product sign- off) Main Contractor and Sub- Contractors. The COBie process includes the following information gathering stages: Owner’s Criteria(Programming / Pre- Design Stage) Building Owner. The below article discusses the data generation and augmentation for the building “Design Stage” (Design Submissions). I’ve put down some of my findings and thoughts on the items which are of interest. It is still not perfect, but it is a great development forward from earlier COBie exporters. Recently you may have seen Autodesk Revit did well out of the “Software for Design” or Model Authoring applications within the 2.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |